Vic Civil were engaged to complete works at the Bidfood site in Morwell for Texco Constructions. Achieving over 3000m2 of heavy-duty external pavement, loading docks and dock leveller slabs, concrete footings, crossovers, raft slabs, kerbs and footpaths across the project scope
Scope
• Pad and strip footings
• Raft slabs
• Dock leveller slabs
• Heavy-duty external pavement
• Exposed aggregate footpath
• Concrete crossovers
• Kerbs
• Sprinkler and water tank slabs
• Bollards