The refurbishment project consists of taking a cold shell building and strengthening the existing lift core and columns to produce a code compliant building fit for future refurbishment by Australia Unity. The project boast working from basement 2 through to level 15 for concrete works consisting of:
- Sandblasting prep and substrates prep
- Drill, dowel and epoxy 40,000 dowel bars
- Supply, fix and placement of 180tonne of steel
- Supply, pump and finish 1000m3 of shotcrete from 40MPa to 65MPa
- Grout and infill in excess of 600 small to large services penetrations in structure