Vic Civil was engaged as the main civil contractor at the new Docklands Studios Stage 6 project, in Docklands Melbourne.
The project is located adjacent to tidal water, resulting in construction methodologies which considered the tidal movements when excavations were undertaken. The project is due for completion at end of 2021.
Scope
Construction of piling bench
Tree removal
Removal of Contaminated soils – Cat B and Cat C
Environmental testing of materials on site
Installation of cast in situ retaining walls
Installation of new asphalt pavements
Excavation of 5m deep ‘Wet Stage’ in Coode island silt to allow underwater filming.