Vic Civil are currently completing an extensive site remediation for a new multi-purpose development site in Cranbourne. The site is full of saturated silty material unsuitable for construction. There is also constant groundwater flowing throughout the sandy-silt layer making any excavation or access extremely difficult. As a result, the entire site of approximately 15,000m2 was excavated and carted off site, and a suitable fill material was imported and placed under Level 1 supervision to enable construction to proceed. Additionally, a permanent subsoil drainage solution was installed to help with the groundwater underneath the capping material.