Major civil works are currently underway at the Plumpton Aquatic Centre, a large and complex community infrastructure project being delivered in partnership with Kane Constructions. The project involves extensive early-stage and structural civil works to support the construction of a new aquatic facility, including swimming pools, basement structures, external pavements, and associated services.

The works require detailed planning, environmental management, and careful coordination across multiple work fronts, with Vic Civil managing challenging ground conditions, deep excavations, and high-volume material movements. As the project progresses, the focus remains on safety, quality, and program certainty to ensure the successful delivery of this significant community asset.

Scope

  • Demolition
  • Non-Destructive Digging for Service Proving
  • Temp Sediment Pond – Environmental Management
  • Concrete to Site Amenities
  • Site Strip & Bulk Excavation
  • Swimming Pool Excavation
  • Pile Spoil Disposal
  • Rain Garden Excavation
  • Rock Excavation & Hammering
  • Piling Platform – Building Bench
  • Piling Platform – Pool Base
  • Perimeter Hardstand
  • Haul Road (including cement treatment)
  • Loading & Laydown Area
  • Contractor Car Park
  • Basement Shotcrete Walls
  • Basement Blinding Layer
  • Swimming Pool Wall Backfill
  • Asphalt Pavement
  • Speed Humps
  • Concrete Underpave
  • Footpath Pavements (exposed concrete)
  • Footpath Pavements (coloured concrete)
  • Concrete Pavements
  • Waterplay – Topping Slabs
  • Asphalt Pavement
  • Gravel Pavement
  • Turf Cell
  • Kerb
  • Line Marking
  • Crossover
  • Bollards
  • Wheel Stops
  • Tactiles & Stair Nosing
  • Car Park Traffic Signage
  • Stormwater
  • Pump Station Pits
  • OSD Tanks
  • Torpedo Tanks
  • Agi
  • Trench Grates