Vic Civil were engaged to remediate an old dry cleaning factory site in Brunswick. The contamination was extensively modelled and contaminant source was to be removed and treated on site. A total of 4000t of material was treated on site through granulated activated carbon filtration in conjunction with aeration of soils.
The contaminated soil was excavated using a hit and miss piling sequence so as to minimise impact on local amenity. This approach significantly reduced the clients remediation costing, leading to more attractive development prospects.