Structural concrete works and electrical trenching at Mortlake power station. Being a 500kV live substation yard, extreme care and awareness of the construction site was required to safely and efficiently, complete our scope of works.
Scope
Detailed excavation for footings and piles
Installation of reinforced concrete piles
Installation of pad footings
Hold down bolt installation
Trenching for electrical conduits and earth strap
Supply and installation of electrical conduits and backfill