Services

Civil Services
Building Services
Infrastructure

Client

Built

Location

Frankston, Victoria

Frankston Hospital

1 / 24
2 / 24
3 / 24
4 / 24
5 / 24
6 / 24
7 / 24
8 / 24
9 / 24
10 / 24
11 / 24
12 / 24
13 / 24
14 / 24
15 / 24
16 / 24
17 / 24
18 / 24
19 / 24
20 / 24
21 / 24
22 / 24
23 / 24
24 / 24

Vic Civil were engaged as structural and civil contractor for the project inclusive of enabling works for the project with dual contract award essentially de-risking the project from a groundworks to structural handover. Works commenced with the establishment of a series of temporary COVID hardstand for the hospital establishment and commenced main works late 2020

Scope

  • Installation of temporary COVID hardstand works
  • Demolition/site clearing and bulk excavation
  • NDD and services proving
  • Essential services excavation and backfilling
  • Kerbs and channel
  • Retaining walls stabilisation works
  • Stormwater and subsurface drainage
  • Pile caps, pad footings and ground beams
  • Concrete hardstands and plinths
  • Structural ground slab works
  • Design and construct PT suspended slabs
  • Temporary works design and formwork design